SHPP Hodonin

Current status: in full operation

Total installed capacity: 2,3 MW (2x1.15 MW)

Type of turbines: 2 x Kaplan vertical-axis turbines

Power generation in 2007: 7,645,580 kWh

SHPP Chynoriansky Mlyn

Current status: in full operation

Total installed capacity: 2x 200 kW(2x1.15 MW)

Type of turbines: 2 x Kaplan horizontal-axis turbines

Planned power generation: 1,515,000 kWh

SHPP Zeliezovce

Current status: in full operation

Total installed capacity: 2,8 MW

Type of turbines: 2 x Kaplan horizontal-axis turbines

Planned power generation: 13 700 MWh

SHPP Cata

Current status: in preparation and development

Total installed capacity: 2,1 MW

Type of turbines: 2 x Kaplan horizontal-axis turbines

Planned power generation: 10 000 MWh

SHPP Rudno nad Hronom

Current status: in prepartion and development

Total installed capacity: 2 MW

Type of turbines: 2 x Kaplan horizontal-axis turbines

Planned power generation: 9 500 MWh

GROUND I

Installed capacity: 999 kW

GROUND II

Installed capacity: 999 kW

GROUND III

Installed capacity: 400 kW

GROUND IV

Installed capacity: 999 kW

FVE Rohovce

Installed capacity: 999 kW

FVE Plešivec

Installed capacity: 997 kW

FVE Dúbravy 1

Installed capacity: 850 kW

FVE Dúbravy 2

Installed capacity: 850 kW

FVE Senec

Installed capacity: 6,21 kW

FVE Dunajská Lužná

Installed capacity: 99,9 kW

FVE Chynorany 1

Installed capacity: 153,15 kW

FVE Nitra

Installed capacity: 92,61 kW

FVE Trenčín

Installed capacity: 47,52 kW

FVE Petržalka

Installed capacity: 63,36 kW

FVE EUROPUR

Installed capacity: 70,07 kW

FVE Chtelnica

Installed capacity: 4,9 kW

Project Nieszawa/Waganiec

The project is under municipality of Waganiec in Poland. Total installed capacity: 49,2 MW.

The layout consist of 24 turbines locations with the maximum dimensions of 105 m hub height and a maximum rotor diameter of 100 m. The maximum turbine capacity is 2,5 MW.

CE Energy Holding is developer of this project.

Status: in development

Project Obrovac

The project is in western Croatia near the town of Obrovac.

Total installed capacity: 42 MW.

Wind farm will comprise 14 V90 3MW wind turbine generators.

CE Energy Holding invests resources in this project and cooperates with developer Eko Energija d.o.o., wholly owned by the EnerCap Power Funds, both of which are managed by EnerCap Capital Partners.

CEE sold this assets to EnerCap.

Status: under construction

Project Horní Lodenice

The project is in eastern Czech republic near the town of Horní Loděnice.

Total installed capacity: 18 MW.

The wind farm was features nine Vestas V90-2MW wind turbines.

CE Energy Holding cooperated with EnerCap and provided technical management services.

CEE sold this assets to EnerCap.

Status: commissioned in July 2009

BPS Hertník

Installed capacity: 998 kWh

Operation start: 2011

Annual production: 8.160 MWh in 2013

Employees: 2

Total investment costs: 4.200.000 EUR